![]() ![]() "Follow up with the patient will be perform in the next few days and ongoing. The 15 Gy was delivered to the keloid surface, and skin tolerance in a single fraction is greater than 25 Gy. "The SH medical physicist noted that 13 Gy in a single fraction is an effective treatment for the patient's condition (keloids on and around both ears). The AU has informed the patient and the referring physician. The incident was discovered around 1630 the same day. The authorized user (AU) intended for 15 Gy to be delivered in three 5 Gy fractions, but it was planned and delivered in a single 15 Gy treatment. "On, a dose misadministration occurred during high dose rate brachytherapy at the Sacred Heart (SH) Radiotherapy Department. The following information was provided by the Washington State Office of Radiation Protection via email: "ĪGREEMENT STATE REPORT - DOSE MISADMINISTRATION "Commercial telecommunications to the plant were restored at approximately 0600 EDT on. "The NRC Decommissioning Inspector has been notified of the retraction. This is consistent with NUREG 1022, Revision 3, Supplement 1, 'Event Report Guidelines 10 CFR 50.72(b)(3)(xiii),' and NEI 13-01, Revision 0, 'Reportable Action Levels for Loss of Emergency Preparedness Capabilities.' It was determined that no actual or potential loss of offsite communications capability existed per 10 CFR 50.72(b)(3)(xiii). Based on further investigation, the Emergency Plan and Emergency Implementing Procedures provide an acceptable alternative routine communication system, which is satellite phones, for communicating with Federal, State, and local offsite agencies, that are in addition to the primary commercial telephone system. ![]() "This notification is being made to retract event EN 56501 that was reported on May 02, 2023. PNP will be notifying the NRC resident inspector. The telecommunications provider has not provided an estimated repair time." The condition did not affect the ENS or commercial telecommunications capabilities at the offsite Emergency Operations Facility. In addition, if needed, the satellite phone would be used to initiate call-out of the emergency response organization. Communications link via the satellite phone was tested satisfactorly. After discovery of the condition it was discovered that this loss also included the emergency notification system (ENS). "At approximately 1500 on, it was determined that the commercial telecommunications capacity was lost to the Palisades Nuclear Plant (PNP) control room and technical support center due to an issue with the telecommunications provider. Fuel injectors are not included.The following information was provided by the licensee via email: The Radium Fuel Delivery System is E85 safe. The fuel pressure regulator return uses a short -6AN prefabricated PTFE hose and adapter fittings to connect to the factory fuel feed line, using it as the return line. Mounted on the fuel rail is the Radium Direct Mount Regulator (DMR) and a Radium FPD-R fuel pulse damper. All necessary dapter fittings and pressure gauge are included. The -8AN feed line travels from the filter up to the Radium EVO 8-9 fuel rail, as shown below. *The factory feed line is used as the new return line* A second 8AN hose routes from the filter outlet up to the fuel rail. A selection of fuel filter elements are available. The filter is mounted to the chassis under the car using a specially designed bracket that does not require any cutting or drilling for installation. Mixing and matching the components of this kit with OEM components will result in a system that is not fully optimized for high performance.Īt the heart of the system is the Radium EVO 8-9 fuel pump hangerįrom the fuel pump hanger, the feed line kit includes a new -8AN PTFE feed line which is plumbed to a Radium in-line fuel filter. It is highly recommended to install this kit as one complete system. The Radium fuel pump hanger, plumbing kit, fuel rail, pulse damper, gauge, and pressure regulator completely replace the restrictive OEM fuel system with a setup capable of supporting well over 1,000hp. This comprehensive kit includes everything required to construct a high performance fuel delivery system for the 2003-2007 Mitsubishi EVO 8-9. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |